Bandipora, Kashmir, July 5: The condition of several roads that were blacktopped during the previous construction season has raised questions over the implementation of the Defect Liability Period (DLP) and the timely execution of maintenance works in the district.
Road stretches, including the Khayar–Boinar road, the Watrina–Lawaypora road, and several other roads across Bandipora, have developed damaged patches despite being blacktopped last year. Residents have questioned whether these projects are covered under the Defect Liability Period, under which contractors are required to rectify defects that arise during the specified period in accordance with the terms of their contracts.
The issue has also brought attention to the role of the District Administration and the Roads and Buildings (R&B) Department in monitoring the condition of recently completed road projects and ensuring that contractors fulfil their maintenance obligations wherever the DLP is applicable.
Locals have urged the authorities to conduct a district-wide assessment of roads blacktopped during the last construction season and initiate repairs before the end of the current working season. They argue that delaying maintenance until October or November may affect the quality of fresh macadamisation due to weather conditions and rainfall, resulting in further deterioration of road surfaces.
Residents have sought timely intervention to ensure that contractual obligations are enforced and that roads are restored before damage worsens.
